Floors

Floors are really just partial ribs, giving some additional structure to the bottom of the boat, as well as providing bearing surfaces for the removable floorboards.  They straddle the keelson, spanning the garboard and second strake, and are glued in with epoxy. 

I elected to pattern each with scraps of planking material... easier to shape than the 4/4 yellow cedar.  Still, spiling the shapes to the bottom at each of 4 stations turned out to be fussy work, especially for the first couple.  Running out of propane for the heater in the middle of the work made for a long session.

When each pattern was close, I traced the profile onto cedar blanks and bandsawed them to shape, and adjusted the profile as necessary with a block plane.  I improved sufficiently over the sequence to motivate me to redo the first of them.

I left the floors at stations 4 and 5 un-shaped on the top. as I have not yet decided how to tie them into the daggerboard case.

About 6 hours over two sessions, including thickness-planing the stock.



Comments

Popular posts from this blog

Connecting a Chart Plotter, VHF, AIS Receiver and Tiller Pilot using the NMEA 0183 protocol

Re-powering s/v Ripple

Installing and Networking a Class B AIS Transceiver with a Chart Plotter and VHF Radio using NMEA 0183